Strongbow (yacht)

The full index of our ship stamp archive
Post Reply
john sefton
Posts: 1816
Joined: Sun Mar 22, 2009 1:59 pm

Strongbow (yacht)

Post by john sefton » Wed Dec 01, 2010 10:33 pm

Built to the orders of Bulmers the brewers in 1972. 65ft in length.
Crewed by Martin Minter Kemp. Sail number 7 in the race. A cutter with a beam of 10ft. Displacement of 8 tons.
Strongbow came in 7th in 28 days 12 hours and 46 minutes, arriving 16 July 1972 at 00.46 b.s.t.. She was actually placed in 28th in the Monohull Handicap in the corrected time of 22 days 21 hours and 04 mins.
Log Book Sept 1987.
Equitorial Guinea 1973
Attachments
Strongbow.jpg

Post Reply